Thursday, 19 September 2013

Wednesday, 18 September 2013

Final presentation ..

 
All corrections have been corrected ..  Bhav said: ' MUCH better' ..
 
NOW .. run run run ,, to the print shop before it gets busier ..



 

 

Tuesday, 17 September 2013

Pre-final presentation ..


As Joe published the dimensions of presentation panels last week, I decided to start them earlier this time to avoid any silly surprises before the deadline and see if one of my supervisors can have a look on it before final printing ..

 
 
 
 
I met Bhav today and got a couple of beneficial comments that I need to rethink about..
I'll try to finish them tonight, HOPFULLY,  and might meet her tomorrow again..
 
 
 
 

Saturday, 14 September 2013

NEW visuals ...

 
 
Re-presenting visuals really took a long time ..
 
 
 
 
 
 
 
 
 
Honestly,  it feel worth it ..


Thursday, 5 September 2013

Prefinal interim ..

Today was the pre-final review.. 

 

 


 
I received some positive feedback, and some negative ones, however I still believe that they will make the project better
 
Positive:
- Project size and arrangement is under control
- Finally, I felt the suitable size of projects ( Woohooo !)
- I've a done a bit lot in the work quantity wise.
-Model is good.
 
Negative:
-Can't see the main concept ( Way finding or social conflicts )
- Make the visuals less real.
- Add people and context.
- Try to take a people to the cafe' area in the pool with out passing the swimming pool with their dirty feet.
- The site has to be bigger.
- Furniture in the plan lighter.
 
 
 

Tuesday, 3 September 2013

Some rendering ..



I just finished rendering some of the interior and exterior visuals .. still needs a lot of work on them, I mean presentation wise ..

Exterior

 


Interior




I'm still missing the GYM ,,, but I think this would be enough for the next interim ..






 
 

Monday, 2 September 2013

Model Making


 
Bits and pieces ..
 
 
I've been to Maudslay this morning to cut the model finally after the delay. Material shop was closed during August, and 118 is closed as well.. Any way I found my way to do it :)


 

And all together ...
 
 
 

Sunday, 25 August 2013

Ascent Private Capital Management’s Elegant Minneapolis Offices




Project: Office Project
Architect: Garcia Tamjidi Architecture Design
Area: 11,000 sqft
Photography: Joe Fletcher




- The Minneapolis offices were designed with a high flexibility and transparency environment to help in performing all interactions that occur between users ( client and team interaction).

- For this reason, the space contain some open/ glass walled meeting rooms beside bringing a sufficient amount of natural lighting and brightness.. 

- Supportive functions, such as storage and staging, are available as well.


- Multi-Functional area : to be transformed as needed (private dining,  presentation, evening events .. etc.)
- Art pieces collection for new local artists.























Saturday, 24 August 2013

Adam’s restaurant ~

By: Heterarchy

Location: Birmingham – UK

       Area: The 70 sq m ..


contemporary fine dining restaurant, serving up a sophisticated blend of familiar flavour combinations with modern, inventive twists.
 

 This is a fine dining restaurant had to be completed within a restricted budget and short timescale. The design team were happy to take the a challenge.


A large Gothic corridor to adds a sense of  magnificence
Cornicing and panelled walls with antique mirrors and faux marble inserts add to the traditional feeling.


- Seating is in a  traditional in style but given a contemporary look.
- Tables are a dark wood veneer and flooring a neutral silvered oak vinyl.











Australasia restaurant

Australasia restaurant by Michelle Derbyshire & Edwin Design, Manchester